Liberia Avenue 3rd lane eastbound

Liberia 3rd laneProject description:
            • Widening of Liberia to 3 through lanes in the eastbound direction between Route 28 and Euclid Ave.
            • Extend existing Route 28 northbound left turn lane on Liberia Ave.
            • Coordination with PRTC to improve future bus stops and potential pull-off lanes
            • Pedestrian Improvements
                  • Sidewalk infill along Route 28
                  • Wider sidewalk with 3’ buffer along Liberia 
                  • New pedestrian crossings on Liberia
              • Two alternatives
                  • Widening to the south
                  • Widening to the north (median)
                • Project Cost: $8.9 million
Two Alternatives:
Status:
Two Alternatives: 
Share your comments and take the survey
Public input is being sought and is critical to receive before a project is recommended to be added to the Capital Improvement Program

Meetings

View the October 13, 2022 Presentation
View the October 13, 2022  Meeting Recording:

Contact: Brian Leckie
Transportation Planner