Godwin Trail (North)

Project description:
- New 10-foot wide, 0.9 mile shared-use path on the east-side of Godwin Drive between Wellington Road and Sudley Road
- Pedestrian improvements at Ashton Ave. and Godwin Drive
- Project Cost: $11.9M
- This project is identified in the Bike Network Plan of the Comprehensive Plan
- The concept was developed in March 2022
- Project is currently unfunded. State/Federal funds are being sought to fund this project.
- The public comment period concluded in February 2023
Godwin Drive North Conceptual Plan
Contact: Brian Leckie, Transportation Planner II